WAPDA New Policy for Installing Multiple Electricity Meters at One Home

Last updated on October 21st, 2025 at 11:36 am

WAPDA Multiple Electricity Meters Policy

WhatsApp Channel Join Now

In 2025, WAPDA and the Power Division of Pakistan announced a new policy for installing multiple electricity meters in one home. The latest clarification ends the confusion and confirms that multiple meters are still allowed under WAPDA Rules 2025.

This policy is crucial for joint families, tenants, and landlords who require separate billing systems for independent portions. It also ensures fair electricity billing, transparency, and prevention of subsidy misuse across Pakistan.


⚑ What Is the WAPDA Multiple Electricity Meters Policy 2025?

The WAPDA Multiple Meters Policy 2025 allows property owners to install more than one electricity meter at the same address, provided each portion functions as a separate living unit.

Conditions for Approval

  • Separate entrance and exit
  • Independent kitchen and wiring system
  • Legal property documents and affidavit confirming separate household
  • Site verification by local DISCO officials (LESCO, FESCO, IESCO, K-Electric)
Also READ  WAPDA Rules 2025: New policy for Installing Multiple Electricity Meters in a Single Home
WhatsApp Channel Join Now

This helps:

  • Large or joint families manage bills individually
  • Tenants receive separate bills under their own CNIC-linked meters
  • WAPDA ensure better electricity billing transparency and power distribution

WAPDA Multiple Electricity Meters Policy 2025
WAPDA Multiple Electricity Meters Policy 2025

🌟 Key Features & Benefits

βœ… Separate billing for tenants and family members
βœ… Fair usage tracking via CNIC-linked meters
βœ… Reduced disputes between households
βœ… Smart meter installation for accurate readings
βœ… Government monitoring to stop subsidy misuse

This electricity meter policy 2025 ensures efficient energy consumption and fair billing for every consumer in Pakistan.


🧾 Eligibility Criteria for Additional Electricity Meters (2025)

RequirementDescription
Separate portionEach unit must have its own entrance and exit
Separate kitchenConfirms it functions as an independent household
Independent wiringA distinct electric circuit for each unit
AffidavitSworn statement confirming separate living unit
VerificationDISCO officials will inspect the property site

πŸ“Œ Note: Applications made only to reduce the bill slab (for subsidy) will be rejected as per the NEPRA Consumer Services Manual.


πŸ“ Application Process for Second Electricity Meter Installation

If you want to apply for an additional meter under WAPDA Rules for multiple meters, follow these simple steps:

  1. Visit your nearest WAPDA/DISCO office (e.g., LESCO, FESCO, IESCO, K-Electric).
  2. Request and fill the New Connection / Additional Meter form.
  3. Attach required documents (see below).
  4. Wait for site inspection by DISCO officials.
  5. Once approved, pay the security deposit and installation charges.
  6. Your meter will be installed under the standard connection procedure.

πŸ“‚ Documents Required for Additional Meter Installation

DocumentPurpose
CNIC copyIdentity verification
Proof of ownership or tenancyConfirms legal rights to property
Affidavit of separate householdLegal proof of separation
Site verification reportConfirms compliance with policy

🧠 Strict Monitoring & CNIC-Based System 2025

To promote electricity billing transparency 2025, all meters are now linked to the applicant’s CNIC.

Also READ  WAPDA Rules 2025: New policy for Installing Multiple Electricity Meters in a Single Home

WAPDA and Distribution Companies (DISCOs) will:

  • Check for duplicate connections under one CNIC
  • Monitor subsidy misuse through multiple single-phase meters
  • Disconnect illegally obtained meters or recover wrongly availed subsidies

This ensures government monitoring of electricity meters while protecting genuine consumers.


πŸ’Έ Expected Costs and Possible Penalties

Costs Include:

  • Meter and wiring charges
  • Installation and line extension costs
  • Smart meter installation (if required)

Penalties Include:

  • Fines for tampering or illegal connections
  • Subsidy recovery for fraudulent users
  • Disconnection of the illegal meter

❌ Common Myths vs. Facts

RumorReality
Only one meter per house is allowed❌ False – Multiple meters are still allowed
All extra meters will be removed❌ False – Legal meters remain active
Tenants cannot apply❌ Wrong – Tenants can apply with landlord’s consent
Government stopped new approvals❌ Incorrect – Approvals continue under WAPDA rules

⚠️ When Can an Application Be Rejected?

Your additional electricity meter application may be rejected if:

  • The request is made only to reduce the bill slab
  • The kitchen or wiring is shared between units
  • Property separation documents are incomplete
  • The local policy restricts new connections

πŸ›οΈ Official Clarification & Current Situation (2025)

In early 2025, rumors spread that WAPDA had banned multiple meters per home.
However, the Power Division Pakistan announcement clearly denied this.

β€œThe policy remains unchanged β€” only enforcement is stricter to prevent misuse,” said a WAPDA spokesperson.

This assures tenants, landlords, and joint families that they can still install second electricity meters in Pakistan, as long as they follow official rules.

Also READ  WAPDA Rules 2025: New policy for Installing Multiple Electricity Meters in a Single Home

πŸ” Government Monitoring Drive 2025

The Power Division has launched a national verification campaign to track:

  • Multiple single-phase meters under the same CNIC or property
  • Fake subsidy and multiple meter misuse cases

However, genuine consumers with verified separate portions remain fully eligible for additional meters.


❓ FAQs: WAPDA Multiple Electricity Meters Policy 2025

Q1: Can I install two meters in one house in Pakistan?
βœ… Yes. If your portion has a separate entrance, kitchen, and wiring, you can apply.

Q2: Is there a ban on multiple electricity meters in 2025?
❌ No. WAPDA and the Power Division confirmed that no ban exists β€” only strict monitoring.

Q3: Can tenants apply for their own electricity meter?
βœ… Yes. Tenants can apply with landlord’s written consent and proper documentation.

Q4: What documents are required?
CNIC, property proof, affidavit of separate portion, and site verification report.

Q5: What happens if someone misuses multiple meters?
WAPDA can disconnect the meter, recover subsidies, and impose heavy fines.


Conditions for Additional Electricity Meters

According to NEPRA Consumer Services Manual and recent clarifications:

  • The portion of the house must be separate.
  • There must be a separate entrance and exit.
  • A separate kitchen is required.
  • A separate electric wiring/circuit must exist.
  • An affidavit confirming a separate household or unit may be required.
  • Local DISCO officials may conduct site verification.

Conclusion

The WAPDA Multiple Electricity Meters Policy 2025 ensures fair billing, transparency, and protection for genuine families and tenants while preventing subsidy misuse.
By following NEPRA guidelines, keeping portions structurally separate, and submitting the required documents, Pakistanis can easily apply for additional meters under WAPDA Rules 2025.

This Power Division Pakistan policy update strengthens consumer protection, supports fair energy distribution, and builds trust in WAPDA’s transparent billing system.

For latest updates: Visit the official cmpunjabscheme.pk

Leave a Comment